Rooppur Nuclear Power Plant Project

Major Work Done: (Mar 2018- Dec 2019)
15 nos of Borehole with 37m depth,
Collecting Disturbed & Undisturbed
Samples, 1500m of Core Cutting of
Pile, Laboratory Test: Grain Size
Analysis, Density etc, Report
Preparation.

Major Work Done: (Jan 2020- Nov 2020)
16 nos of Borehole with 31.5m depth,
Collecting Disturbed & Undisturbed
Samples, 2000m of Core Cutting of Pile,
Laboratory Test: NMC, Grain Size
Analysis, Density etc.

Client : BAUER Bangladesh

Duration: Mar 2018- Dec 2020

Project Location: Rooppur, Ishwardi, Pabna