Major Work Done:
Cary out the geotechnical soil
investigation of the proposed project, 21
nos Onshore Borehole with 57m to 90m
depth, 3 nos Offshore Borehole with 57m to
62m depth, Laboratory Test: NMC, SPG,
Grain Size Analysis, Atterberg Limit,
Consolidation, UCS Test, Direct
Shear,Triaxial UU, Organic Content etc.
Major Work Done:
Onshore:
30 nos of Borehole with 25m to 50m depth
45 nos of CPTu with 20-30m depth
Offshore:
58 nos of Borehole with 6m to 35m depth
5 nos of CPTu with 20-25m depth
Average sea water depth at test locations:
30m & Max distance from the shore was 40km
Carry out the soil resistivity test, Laboratory Test:
NMC, SPG, Grain Size Analysis, Atterberg Limit,
Consolidation, UCS Test, Direct Shear, Triaxial
UU, Proctor Test, CBR etc.
Client : Payra Port Authority
Duration: Mar 2018- Dec 2019
Project Location: Kalapara, Patuakhali
Client : Jan De Nul NV
Duration: Oct 2021-May 2022
Project Location: Kalapara, Patuakhali
Duration: Mar 2018- Dec 2019