Site Address: Niketon, Dhaka
Project Commissioning Date: May 2016
Notes:
This architectural design drawing should be read in conjunction with the structural design drawing, as well as other related drawings (e.g., electrical, plumbing, fire fighting, etc.) during the construction phase. The drawing has been prepared based on the client’s program and the provided site survey.