Matarbari USC Coal Fired Power Plant at Matarbari, Moheskhali, Cox’s Bazar

Major Work Done:
Carry out Geotechnical Investigation in whole project area.
Number of Borehole: 102 with 10m to 59m depth.
Laboratory Test: NMC, SPG, Grain Size Analysis, Atterberg Limit, Density,
Consolidation, Direct Shear, UCS etc.
Field Test: Field CBR, Field Density, DCPT
Calculation of Bearing Capacity for both Pile & Shallow foundation.

Client : POSCO C&T, KOREA

Duration: Feb 2019-Aug 2019

Project Location: Moheskhali, Cox’s Bazar