Major Work Done:
Carry out Geotechnical Investigation in whole project area.
Number of Borehole: 102 with 10m to 59m depth.
10 nos cone penetration test (CPTu)
Laboratory Test: NMC, SPG, Grain Size Analysis, Atterberg Limit, Density, Consolidation,
Direct Shear, UCS etc.
Field Test: Field CBR, Field Density, DCPT
Calculation of Bearing Capacity for both Pile & Shallow foundation
Client : Aviation Dhaka Consortium (ADC)
Duration: 2019-2023
Project Location: Kurmitola, Dhaka