305km Chittagong to Dhaka oil pipe line route survey &
Geotechnical investigation for Padma Oil Ltd.

Major Work Done:
60 Number of Borehole with 15m to 30m depth.
Carry out the soil resistivity test
Laboratory Test: NMC, SPG, Grain Size Analysis, Atterberg Limit, Consolidation, UCS Test,
Direct Shear, Triaxial UU, Proctor Test, CBR etc.

Client : Bangladesh Army & Engineering India Ltd, India

Duration: Feb 2018 - Mar 2019

Project Location: Chittagong

305km Chittagong to Dhaka oil pipe line route survey & Geotechnical investigation for Padma Oil Ltd.